Here is the updated version of that older post.
We've mentioned before that the building has two phases; 1st phase is just the bottom floor and the 2nd phase is the second story.
We've enough funds to complete the "1st phase" and have already begun construction.
The photo is the best I can do with my limited cut and paste skills.
This is looking down from the orphanage. 42 feet long 32 feet wide. The bathrooms to the left and the front door to the right. They are to pour the ceiling shortly and the 1st floor will be completed early July.Bottom floor
2nd floor is designed for long term guest.
2nd floor, front right view, orphanage in back left.
As for the 2nd Floor we are currently raising funds with the hopes that the builders can continue and finish the project in one go.
If you're interested in knowing the financial details of Phase 2 there will be a tab on the upper right corner called "Current Needs".
Thank you